![]() ![]() Any time requested by the Group HSE Manager or the Project Director. 10 Points of Lift Plan Development Lift Planning Considerations ASME B30, P30, and BTH-1 Overview Videos. If the actual information at the lifting site does not tally with the lifting plan, you should stop the operation until the plan has been updated and re-approved. The project is conducting a critical lift that meets the following criteria: o Lifts over 90 of capacity at set up and configuration, o Picks involving more than two pieces of mobile equipment, or o Any lift over the general public. Additional Lift Planning Resources Recorded Webinars.You should never deviate or vary from the approved lifting plan.Sketch of the lifting zone (showing position of lifting equipment, crew and load) and.Requirements to erect or dismantle lifting equipment (if any).Lifting crew (including their roles and competencies).Your lifting plan should include, but not limited to, the following elements: load capacity chart, range diagram, rigging method)įor complex lifts, additional engineering design efforts are necessary to ensure that the lifting operation is conducted safely. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |